home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V10_4 / V10_411.TXT < prev    next >
Internet Message Format  |  1991-07-08  |  22KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from sushi.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/4Zf2aNe00WCN8Alk44>;
  5.           Thu, 11 Jan 90 01:37:14 -0500 (EST)
  6. Message-ID: <kZf2aGa00WCN4Ak04o@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Thu, 11 Jan 90 01:37:07 -0500 (EST)
  11. Subject: SPACE Digest V10 #411
  12.  
  13. SPACE Digest                                     Volume 10 : Issue 411
  14.  
  15. Today's Topics:
  16.            Payload Status for 01/10/90 (Forwarded)
  17.            Red Shifts through Random Media
  18.            Frequently asked SPACE questions
  19.             Re: Big Bang:  Did it happen?
  20.               Galileo Update - 02/10/90
  21.           Still more HR2674 testimony (part 2 of 2)
  22. ----------------------------------------------------------------------
  23.  
  24. Date: 10 Jan 90 21:11:13 GMT
  25. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  26. Subject: Payload Status for 01/10/90 (Forwarded)
  27.  
  28. Daily Status/KSC Payload Management and Operations 01-10-90
  29.        
  30.          
  31. - STS-31R HST (at VPF) -
  32.       
  33. HST high gain antenna pre load checks and MUE validation was   
  34. worked yesterday.  HST high gain antenna hat coupler          
  35. installation was completed last night.  One more connection
  36. will be made this morning after access is established before
  37. beginning the HST functional testing.
  38.         
  39. - STS-32R SYNCOM (at Pad A) -
  40.        
  41. With the launch of STS-32R the final planning for download   
  42. of LDEF and SYNCOM ASE are now being put together.  The
  43. SYNCOM GSE was disconnected yesterday and will be removed
  44. from the pad today.
  45.        
  46. - STS-35 ASTRO-1/BBXRT (at O&C) -
  47.         
  48. Yesterday cotter pin encapsulation and safety wire trunnion 
  49. bolts (both crew alerts) were completed.  Igloo tilt device
  50. hoist and setup to cite and igloo tilt is complete.  SPDB        
  51. change out is complete.  Fuse holder that was discovered     
  52. broken on "J" box has been replaced and addition fuse holder      
  53. protection is to be put in place this morning.  BBXRT was
  54. powered up yesterday and IPR troubleshooting was performed.
  55.  
  56. - STS-40 SLS-1 (at O&C) -
  57.         
  58. Racks 7 and 11 weight and CG were performed.  Cabin fan      
  59. assembly Pyrell replacement worked yesterday.  MVAK training  
  60. pre ops commenced and will continue through the week.   
  61.  
  62. - STS-42 IML (at O&C) -
  63.       
  64. Structural mods (upper mods) for rack 9 and 11 were worked
  65. yesterday.
  66.  
  67. ------------------------------
  68.  
  69. Date: 10 Jan 90 22:16:29 GMT
  70. From: zaphod.mps.ohio-state.edu!swrinde!emory!hubcap!panoff@tut.cis.ohio-state.edu  (Robert M. Panoff)
  71. Subject: Red Shifts through Random Media
  72.  
  73.  
  74. Help!  I need a reference to some very recent work that I have only
  75. heard about:  apparently if light is passed through a random medium,
  76. and this experiment has been done in some labs already, the light is red
  77. shifted.  Naturally, this has consequences for interpreting red shifts
  78. from "distant, fast moving" galaxies as possibly being closer, but the
  79. light passes through the interstellar media, which is random.  Anybody
  80. have a definite pointer to authors, papers, workers?  Thanks in
  81. advance.
  82. -- 
  83. rmp, for the Bob's of the World
  84.  
  85. ------------------------------
  86.  
  87. Date: Wed, 10 Jan 90 04:00:19 PST
  88. From: Eugene Miya <eugene@amelia.nas.nasa.gov>
  89. Subject: Frequently asked SPACE questions
  90.  
  91. This list does change.
  92.  
  93. This is a list of frequently asked questions on SPACE (which goes back
  94. before 1980).  It is in development.  Good summaries will be accepted
  95. in place of the answers given here.  The point of this is to circulate
  96. existing information, and avoid rehashing old answers.  Better to
  97. build on top than start again.  Nothing more depressing than rehashing
  98. old topics for the 100th time.  References are provided because they
  99. give more complete information than any short generalization.
  100.  
  101. Questions fall into three basic types:
  102. 1) Where do I find some information about space?
  103. Try you local public library first.  You do know how to use a library, don't
  104. you?  Can't tell these days.  The net is not a good place to ask for
  105. general information.  Ask individuals if you must.  There are other sources,
  106. use them, too.  The net is a place for open ended discussion.
  107.  
  108. 2) I have an idea which would improve space flight?
  109. Hope you aren't surprised but 9,999 out of 10,000 have usually been
  110. thought of before.  Again, contact a direct individual source for
  111. evaluation.  NASA fields thousands of these each day.
  112.  
  113. 3) Miscellanous queries.  Sorry, have to take them case by case.
  114.  
  115. Initially, this message will be automatically posted once per month
  116. and hopefully, we can cut it back to quarterly.  In time questions and
  117. good answers will be added (and maybe removed, nah).
  118.  
  119. 1) What happen to Saturn V plans? What about reviving the Saturn V
  120. as a heavy-lift launcher?
  121.  
  122. Possible but very expensive -- tools, subcontractors, plans, facilities
  123. are gone or converted for the shuttle, and would need rebuilding,
  124. re-testing, or even total redesign.
  125.  
  126. 2) Where can I learn about space computers: shuttle, programming,
  127. core memories?
  128.  
  129. %J Communications of the ACM
  130. %V 27
  131. %N 9
  132. %D September 1984
  133. %K Special issue on space [shuttle] computers
  134.  
  135. Other various AIAA and IEEE publications.
  136.  
  137. Computers in Spaceflight: The NASA Experience
  138. James E.  Tomayko
  139. 1988?
  140.  
  141. 3) SETI computation articles?
  142.  
  143. %A D. K. Cullers
  144. %A Ivan R. Linscott
  145. %A Bernard M. Oliver
  146. %T Signal Processing in SETI
  147. %J Communications of the ACM
  148. %V 28
  149. %N 11
  150. %D November 1984
  151. %P 1151-1163
  152. %K CR Categories and Subject Descriptors: D.4.1 [Operating Systems]:
  153. Process Management - concurrency; I.5.4 [Pattern Recognition]:
  154. Applications - signal processing; J.2 [Phsyical Sciences and Engineering]:
  155. astronomy
  156. General Terms: Design
  157. Additional Key Words and Phrases: digital Fourier transforms,
  158. finite impulse-response filters, interstellar communications,
  159. Search for Extra-terrestrial Intelligence, signal detection,
  160. spectrum analysis
  161.  
  162. ------------------------------
  163.  
  164. Date: Wed, 10 Jan 90 09:15:58 PST
  165. From: pjs@aristotle.Jpl.Nasa.Gov (Peter Scott)
  166. Subject: Re: Big Bang:  Did it happen?
  167.  
  168. In article <822@tahoma.UUCP>, jpg3196@tahoma.UUCP (James P. Galasyn) writes:
  169. > I just heard from a fairly reliable source that CalTech has demonstrated
  170. > the Big Bang never happened.  
  171.  
  172. Actually it has just been postponed until a more suitable date.
  173.  
  174. Peter Scott (pjs@grouch.jpl.nasa.gov)
  175.  
  176. ------------------------------
  177.  
  178. Date: 11 Jan 90 01:11:05 GMT
  179. From: elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke@cs.ucla.edu  (Ron Baalke)
  180. Subject: Galileo Update - 02/10/90
  181.  
  182.  
  183.                    GALILEO MISSION STATUS
  184.                       January 10, 1990
  185.  
  186.           Today the Galileo spacecraft is 15.6 million miles
  187. from Earth; round-trip light time is 2-3/4 minutes.  It has
  188. traveled 128.5 million miles along the first leg of its
  189. trajectory, with a current heliocentric velocity of about
  190. 73,000 mph.  The total trajectory distance traveled will be
  191. 185 million miles at Galileo's Venus flyby February 9, 1990,
  192. and 2.4 billion miles at Jupiter arrival December 7, 1995.
  193.  
  194.           The spacecraft is in "dual spin" mode, with the
  195. upper part spinning at 3.15 rpm and the lower part non-
  196. spinning with gyro-based control.  All temperatures and
  197. pressures are within acceptable limits; telemetry is being
  198. sent via the second low-gain antenna (mounted below a power
  199. generator boom) at 1,200 bits per second. The spacecraft
  200. attitude sun point angle is 1.96 degrees.
  201.  
  202.           Data from the four-day checkout of science
  203. instruments, concluded December 30, are still being studied. 
  204. Because of very high winds at the Deep Space Network tracking
  205. station in Goldstone, California, some data were lost during
  206. the checkout operations but not enough to compromise the
  207. checkout.  The heavy ion counter, magnetometer, dust
  208. detector, ultraviolet and extreme ultraviolet instruments
  209. remain powered on.  
  210.  
  211.           Some of the memory in the extreme ultraviolet
  212. instrument's microprocessor was found to be corrupted; it was
  213. reloaded without incident and the instrument is now operating
  214. nominally, and being watched.  Covers on the near-infrared
  215. mapping spectrometer (NIMS), both ultraviolet instruments and the
  216. dust detector were removed on schedule during the checkout. 
  217. The infrared instrument appeared to be cooling more slowly
  218. than expected after the cover was removed from its cooling
  219. radiator. Yesterday a nearby heater, switched on earlier,
  220. was turned off and the cooling rate improved. Based on this,
  221. it was concluded that the NIMS radiator cover was fully deployed. 
  222.  
  223.           The AC imbalance measurements reached a level which
  224. indicated a "hard" short chassis. The measurement remained at
  225. this level throughout the tracking pass. The DC imbalance
  226. measurement continued to slowly increase from about 20 volts
  227. to 20.6 volts and remained stable.
  228.  
  229.           The spacecraft is normally executing the block of
  230. commands designated Earth-Venus #5, which began Monday and
  231. will last until February 5.
  232.  
  233.  Ron Baalke                       |    baalke@mars.jpl.nasa.gov 
  234.  Jet Propulsion Lab  M/S 301-355  |    baalke@jems.jpl.nasa.gov 
  235.  4800 Oak Grove Dr.               |
  236.  Pasadena, CA 91109               |
  237.  
  238. ------------------------------
  239.  
  240. Date: 10 Jan 90 15:11:57 GMT
  241. From: mailrus!sharkey!itivax!vax3!aws@tut.cis.ohio-state.edu  (Allen W. Sherzer)
  242. Subject: Still more HR2674 testimony (part 2 of 2)
  243.  
  244.  
  245. STATEMENT OF DONALD K. SLAYTON
  246. PRESIDENT
  247. SPACE SERVICES INCORPORATED OF AMERICA
  248. Before the
  249. SUBCOMMITTEE ON SPACE SCIENCE AND APLICATIONS
  250. COMMITTEE ON SCIENCE AND TECHNOLOGY
  251. U.S. HOUSE OF REPRESENTATIVES
  252. November 10, 1989
  253.  
  254. Mr. Chairman:
  255.  
  256. Although I am President of an entrepreneurial small launch
  257. vehicle company, Space Services Inc., Today I am acting as
  258. the witness for the Commerical Space Transportation
  259. Advisory Committee which reports to the Secretary of
  260. Transportation.  COMSTAC - as it is called - has members
  261. representing the launch vehicle industry, the satellite
  262. industry, insurance companies, engineering firms, and
  263. others.  Dr.  Alan Lovelace is the current Chairman of
  264. COMSTAC and regrets tat he is unable to appear bedcause
  265. this hearing today conflicts with a very important
  266. Corporate meeting.  As Vice Chairman of this committee, I
  267. am please to act as its representative.
  268.  
  269. COMSTAC agrees with the intent of this bill.  It is not
  270. easy to change the proven way that the government has used
  271. to get its satellites into orbit with expendable launch
  272. vehicles over the more than thirty years there has been a
  273. space business.  But there are certain truths today: (a)
  274. the U.S.  industry is unquestionably capable of providing
  275. reliable and cost effective transportation into space; (b)
  276. commercial ELV launch services are available to government
  277. users today from at least seven U.S.  companies whose
  278. performance capabilities cover almost the total spectrum of
  279. payload weights; and (c) procurement of these commercial
  280. services can result in significant cost savings to the
  281. Federal Government.
  282.  
  283. The difficulty in having all government officials embrace
  284. the concepts contained in this bill is at least three-fold.
  285. Some opponents feel that their responsibility fopr doing
  286. everything possible to ensure that their satellite has a
  287. reliable launch demands the strong government of the past.
  288. Some understandably, see a negative effect on their
  289. organization if its responsibilities are lessened.
  290. Probably most important is that procurement officials are
  291. reluctant because the existing Federal Acquisition
  292. Regulations do not encourage innovation on the part of the
  293. person who signs hsi name as a contracting officer.  The
  294. later leads to retention of clauses that are not
  295. appropriate.  A recent Request for Proposal required a
  296. detailed plan on how labor rates were to be controlled and
  297. yet it was for a fixed-price contract!
  298.  
  299. COMSTAC has been concerned about these problems for the
  300. past two years and established a procurement subcommittee
  301. to address the question of how the government could procure
  302. commercial launch services.  Every U.S.  launch services
  303. company was represented on this subcommittee.  A report was
  304. prepared containing a policy statement, a sample RFP, and a
  305. Model Contract.  The report was approved by the whole
  306. COMSTAC committee and submitted to the Secretary of
  307. Transportation with the recommendation that it be
  308. distributed to DoD, NASA, NOAA, OMB, and other relevant
  309. departments.
  310.  
  311. There has to be an abrupt change in mentality for
  312. government officials to shift from buying of launch
  313. vehicles as in the past to just buying of transportation
  314. services.  The government buys all kinds of commercial
  315. transportation services wherein the vehicles are trucks and
  316. trains and ships and airplanes.  The cargo might be
  317. extremely valuable just as are satellites.  These services
  318. are nearly always fixed pricee and the vehicles are not
  319. usually built to a large set of government specs with
  320. stringent government oversight during construction.  The
  321. launch industry has readched a state of maturity that it
  322. can be treated similarly.  The risks can be placed with the
  323. commercial provider, not retained with the government.  The
  324. conclusion has been reached in the commercial satellite
  325. industry where spacecraft valued at up to $100M are now
  326. routinely launched by the commercial launch services
  327. industry.  We recognize, as does this bill, the need for
  328. exceptions to commercial buys such as high valued national
  329. security payloads.
  330.  
  331. COMSTAC agrees with the bill's provision that U.S.
  332. government payloads be assigned to U.S.  launch vehicles.
  333. The worldwide commercial launch service market is thin.
  334. There are many payloads in Europe, China, and the Soviet
  335. Union which are not accessible to U.S.  launch providers.
  336. The competition for our government payloads should be among
  337. the U.S.  launch providers if we are to ensure a robust
  338. commercial launch industry.  A similar benefit is enjoyed
  339. by Ariane for ESA payloads.
  340.  
  341. International competition from the non-market economy
  342. contries, China and USSR is a very serious concern of our
  343. launch industry.  We cannot compete against contries who
  344. are willing to offer the same services at a fraction of the
  345. price of the Western market.  If this is allowed without
  346. constraints there will be NO U.S.  commercial launch
  347. industry - at least this would be true among the major
  348. players, General Dynamics, Martin Marietta, and McDonnell
  349. Douglas.  Our communications satellite industry will be
  350. completely dependent on foreign launch vehicles.  The next
  351. phase is likely to be the loss of our satellite industry
  352. also.  As the bill states the U.S.  commercial space
  353. transportation industry is an essential component of
  354. national efforts to assure access to space for government
  355. and commercial users.
  356.  
  357. A potential role for the Federal Government which is
  358. touched upon in the findings of this bill relates to the
  359. development of commercial launch facilities.  The big three
  360. launch providers are operating out of the national ranges
  361. in Florida and California.  The smaller vehicles are
  362. looking primarily at those same ranges plus Wallops Island
  363. and White Sands.  The Cape and Vandenberg ranges are
  364. approaching saturation.  The need for development of one or
  365. more commercial launch sites in the future seems likely.  A
  366. very big deterrence to this happening is the high cost of
  367. thte infrastructure needed for such a facility.  Range
  368. safety and other tracking capabilities are good examples of
  369. the infrastructure needs.  Government support for such
  370. infrastructure improvements seem as logical here as FAA
  371. stations for air transportation.
  372.  
  373. The commercial launch industry is able to compete fairly
  374. well with its European competitor.  One of the reasons is
  375. that our three major vehicle companies have put over $500M
  376. of corporate funds in improvements to the vehicles and
  377. facilities to date.  But COMSTAC is concerned about our
  378. ability to compete in the future faced with the European
  379. development of Ariane V, with the arrival to the market of
  380. the Japanese H-2, plus the Chinese Long March and Soviet
  381. Zenit.  We formed a component technology subcommittee to
  382. address this problem.  We have recommended that NASA meet
  383. with this group and listen to the needs of industry in
  384. order to maintain our competitiveness, as they plan the
  385. expenditure of their supporting research and technology
  386. funds.  This is industry support similar to that given by
  387. NASA's predecessor agency NACA, whose outstanding
  388. assistance led to U.S.  preeminence in aviation.  While
  389. this could be quite supportive in the near term, it may not
  390. be enough over the longer term -- say after 1995.  Consider
  391. Ariane V.  The development is funded completely by the
  392. European Space Agency.  It is designed to launch Hermes, to
  393. carry scientific payloads, and to be be *the* commerical
  394. launch vehicle of the future.  Arianspace has already
  395. started marketing the Ariane V at prices that we expect are
  396. very attractive because Arianespace does not have to
  397. recover the development costs as our industry would.  It
  398. remains to be seen whether or not our government, in order
  399. to support our international competitiveness, would be
  400. willing to support the development of a new launch vehicle,
  401. such as a version of the ALS, whose major role would be the
  402. support of commercial needs.  This is one of the important
  403. questions that needs to be addressed in the forthcoming
  404. study to be performed by the National Space Council.
  405.  
  406. Mr.  Chairman, COMSTAC applauds the spirit and intent of
  407. this bill.  It puts some teeth into the broad policy
  408. statements of the past several years.  It will help
  409. stabilize the commercial launch industry and it will help
  410. the Federal Government lower its cost of space
  411. transportation.
  412.  
  413. This concludes my testimony on behalf of the COMSTAC.
  414. While I have the floor, and with you permission Mr.
  415. Chairman, I'd like to respond to your request for our
  416. analysis of the effectiveness of existing legislation based
  417. on our experience.  We believe the Commercial Space Launch
  418. Act of 1984, its 1988 amendment, and the President's Space
  419. Policy NSDD of 1988 are all excellent documents and lay a
  420. good foundation for the commercial launch industry.  There
  421. are a couple areas involving definitions and juridictions
  422. that require clarification, amendment and/or enforcement.
  423. I believe the problems relate more to implementation than
  424. direction.  We have our Flight Readiness Review tomorrow
  425. for a 15 November launch of our second Starfire launch
  426. which coincidentally is the nation's second commercial
  427. suborbital flight.  A week ago we were threatened with a
  428. shutdown of our WSMR range operations because of a
  429. difference of opinion between Washington and the field.
  430. DOT believes it has the authority to issue launch licenses
  431. and set insurance requirements for all commercial launches.
  432. As of last week there are others who don't agree with
  433. either the scope of the launch license *or* the insurance
  434. orders.  This was also true on the first launch.  As a
  435. small entrepreneurial company we are in a nutcracker,
  436. poorly equipped to adjudicate these honest differences of
  437. opinion between and within Federal agencies.  Therefore we
  438. are carrying double the liability and four times the
  439. property insurance required by our DOT license.  Our MOA
  440. witht the USN purports to supercede the launch license
  441. where differences occur.  These jursdictional disputes need
  442. to be settled and maybe this bill is an appropriate
  443. mechanism to do it.  A key issue is what are licensed
  444. versus unlicensed operations on a government range.
  445.  
  446. Another discrepancy is the acceptance of the definition of
  447. expendable launch vehicles (ELV's).  The Space Act clearly
  448. defines launch vehicles to include
  449. "any suborbital rocket." The NSDD of January 1988
  450. encourages reliance on private launch services and
  451. prohibits NASA from maintining an ELV adjunct to the STS.
  452. However, with the exception of support for the NASA CCDS,
  453. all government (and some non-government) suborbital flights
  454. are being done and are planned to continue being done *by*
  455. the government.  This act defines a space launch as flight
  456. above 70 km which is fine b4ecause it clarifies the
  457. definition of suborbital vehicles.  However, it has the
  458. same probability of being ignored as previous legislation
  459. and executive direction on the subject.  It would seem
  460. either some teeth to encourage implementation of current
  461. direction ore an exception to acknowledge and concur in
  462. non-implementation might be in order.  The Delta is the
  463. onlyl other vehicle launched under the Commercial Space
  464. Launch Act to date.  Their experience is similar to ours.
  465.  
  466. 1.  Top level policy and directions are fine.  There are
  467. still some problems with implementation at the lower
  468. levels.  The policy has not flowed down or been totally
  469. accepted.  I believe this is partly resistance to change
  470. and losing turf and partly a real problem with existing
  471. FAR's, etc.  needing changes.
  472.  
  473. 2.  DoD security requrements on the range are excessive for
  474. commercial operations and cause operational problems.
  475.  
  476. 3.  Clearing foreign nationals onto the range who may be
  477. customers or participants is a tedious and time consuming
  478. process not conductive to good comercial marketing
  479. practices.
  480.  
  481. 4.  The range is unable to configure from one vehicle type
  482. to another in a timely fashion.  This impacts launch
  483. schedules.
  484.  
  485. Thank you.  We are available for questions at your
  486. discretion.
  487.  
  488. ---------------------------------------------------------------
  489. Thanks to Catherine Rawlings for sending me all the HR2674
  490. hearings testimony (she's Packard's aide for the Space
  491. Science and Applications Subcommitee), and to the
  492. Industrial Technology Institute for letting me type this in
  493. during my lunch hour on a Lisp machine with a decent editor
  494. (what a waste, but it sure beats banging away at 1200 baud
  495. on my home laptop).
  496. ------------------------------Tihamer Toth-Fejel ttf@iti.org----
  497.  
  498.  
  499.  
  500.  
  501.  
  502.  
  503. ----------------------------------------------------------------------------
  504. | Allen W. Sherzer                    |  Is the local cluster the result   |
  505. |  aws@iti.org                        |  of gerrymandering?                |
  506. ----------------------------------------------------------------------------
  507.  
  508. ------------------------------
  509.  
  510. End of SPACE Digest V10 #411
  511. *******************
  512.